01.08.2023

Sustainable energy supply for Progroup’s corrugated board plant

Progroup is one of the largest producers of corrugated base paper and corrugated board formats on the European market. The new “PW15” corrugated board plant in Petersberg, near Pirmasens in the Palatinate, requires sustainably sourced energy in the form of steam, chilled water and heating energy for production.

AGO GmbH Energie + Anlagen from Kulmbach was commissioned by Progroup to supply and install the technical equipment and piping systems. This includes the supply of steam, compressed air, chilled water and heating water, as well as the complete ventilation technology, including heat recovery systems. This marks the fourth time within Europe that AGO GmbH has been commissioned by Progroup for this scope of work and supply.

Steam is generated by a dual-fired boiler capable of delivering 10 t/h of saturated steam at a pressure of 15.0 bar. The steam is used for the production and bonding of the adhesive for the corrugated board in the production line of the corrugator. An absorption chiller, which generates 700 kW of cooling capacity – sufficient to meet the cooling requirements of the corrugator – is operated via a steam converter or, alternatively, via two CHP units.

Due to complex adjustments during the construction process, this required extremely sophisticated coordination of the logistics.

Below you will find some impressions of the Progroup plant in Petersberg near Pirmasens.

Further news from and about AGO GmbH Energie + Anlagen

2 June 2023 News

Berlin Energy Days 2023

Last weekend saw the Berlin Energy Days 2023, a major event for the energy transition and sustainability. ...

21 April 2023 News

4th Helmbrechts Career Fair

On 21 April 2023, we’ll be at the 4th Helmbrechts Career Fair at the Stofffabrik (former vaccination centre) in Helmbrechts. Come and visit us ...

22 March 2023 News

AGO to supply two new 50-tonne once-through boilers to K+S Minerals and Agriculture GmbH

AGO GmbH Energie + Anlagen of Kulmbach has been commissioned to refurbish the backup steam generation plant. ...

21 March 2023 News

FUTURE.gram Bindlach 2023 Training Fair

FUTURE.gram 2023! The FUTURE.gram training fair will take place again at the Bärenhalle in Bindlach from 23–24 March 2023. Come and see AGO at ...