GELO Wunsiedel Heating Plant

Heating plant for supplying heat to the drying facilities at the newly constructed GELO Timber sawmill in Wunsiedel.

Dual-fuel burner for the use of natural gas or hydrogen from the WUN-H2 production plant, equipped with all necessary safety devices and inerting measures for H2 operation. Signal exchange between H2 generation and the higher-level control system of the energy park to ensure economically optimal operation of all heat generators.

Technical data:

  • Thermal output (natural gas): 5,000 kW
  • Thermal output (100% H2): 4,450 kW
  • Overall boiler efficiency: 95.7%
  • Heat storage: 100 m³ capacity