BEKA Wannberg

To provide ventilation for the hall, three ventilation units with rotary heat exchangers and a heating function were installed on the technical bridge within the hall. The ventilation system for the staff area, featuring heat recovery and heating functions, was also installed on the technical platform. The administration area and the kitchen/canteen were each fitted with a separate ventilation unit featuring plate heat recovery and a heating function. These were installed on the building roof in the vicinity of the rooms to be served. The electrical and server rooms were additionally equipped with split-type air conditioning units.

Technical data:

  • Air flow rate of HVAC units: approx. 127,000 m³/h
  • Heater output: 459 kW
  • Split cooling capacity: 13 kW
  • Heat recovery capacity: 1,055 kW
  • Client: Dechant Hoch- und Ingenieurbau GmbH
     

 