ZEAG Heilbronn
Construction of a new heating plant for heat supply. The plant comprises high-pressure steam generators, feedwater degassing, condensate tanks, water treatment and automatic control systems.
The plant was designed with redundancy to ensure supply reliability.
Technical data:
- Steam generation: 3 × 12.0 t/h, 15.5 bar
- Thermal output: 16.8 MW
- Oil storage tank: 90,000 litres