The existing KWK plant (1st construction section 2012 by AGO) on the SÜC premises in Coburg has been expanded by two additional natural gas engines for electricity and heat generation.


The heat produced is fed into the existing district heating network of the SÜC.

Technical data:

  • Electrical power: 2 × 1.497 kW
  • thermal power: 2 × 1.581 kW

Related projects

CEB Coburg
Ventilation
HUK Coburg
Heat Ventilation
Intercity Hotel Hamburg
Cooling Ventilation
BEKA Wannberg
Ventilation