SÜC Coburg
The existing CHP plant (first construction phase in 2012 by AGO) on the SÜC site in Coburg has been expanded to include two additional natural gas engines for electricity and heat generation.
The heat generated is fed into SÜC’s existing district heating network.
Technical data:
- Electrical output: 2 × 1,497 kW
- Thermal output: 2 × 1,581 kW