The supply lines for gas, water and waste water (GWA) as well as the ventilation from the stock were connected to the laboratory furniture and the complementary installations.

Technical data:

GWA connections:

  • compressed air
  • Drinking water
  • Dirt & Laboratory waste water
  • VE water
  • Process cooling water
  • Cold
  • Purified gases (CO)2 / N2 / WG)
  • Natural gas


RLT connectors from PPs:

  • Digestor
  • Extraction
  • Dangerous cabinets
  • Laboratory ventilation