The supply lines for gas, water and waste water (GWA) as well as the ventilation system were connected from the existing building to the laboratory furniture and additional fittings.

Technical data:

GWA connections:

  • Compressed air
  • Drinking water
  • Wastewater and laboratory effluent
  • Deionised water
  • Process cooling water
  • Refrigeration
  • Ultra-pure gases (CO2 / N2 / WG)
  • Natural gas


HVAC connections made of PPs:

  • Fume cupboards
  • Extraction systems
  • Hazardous substance cabinets
  • Laboratory ventilation