Expansion of the district heating network’s capacity through the construction of a new boiler house. Complete plant construction for a final capacity of 35 MW FWL. 

The contract also included the construction of a new pressure maintenance system for the district heating network (redundancy for the existing pressure maintenance system), ventilation, gas supply, heating oil supply including a tank facility, water treatment, building heating and sanitary engineering.

 

Technical data:

  • 2 bivalent hot water boilers for gas/heating oil combustion, each with 8.7 MW district heating output
  • Design TS: 120 °C PS: 16 bar (DGRL Cat. II)
  • Total supply air: 42,400 m³/h
  • Total exhaust air: 19,700 m³/h