K + S Minerals and Agriculture Werra

AGO GmbH Energie + Anlagen has designed and installed a superheated steam plant for its client K + S Minerals and Agriculture GmbH in Werra. The plant consists of two double-flame-tube fire-tube boilers, each with a steam output of 50 t/h, as well as a pressure reduction station to 1 bar g and 3 bar g.

Technical data:

  • Steam capacity: 10 to 100 t/h
  • Design parameters: 250 °C at 13.0 bar g
  • Pressure reduction station: 1 bar g, 10 to 70 t/h
  • Nominal diameter inlet/outlet: DU 1 bar g.u., DN300 / DN1000
  • Pressure conversion station: 3 bar g, 10 to 70 t/h
  • Nominal diameter inlet/outlet: DU 3 bar g, DN300 / DN600