Construction of a new technical centre for Milchwerke Oberfranken at the Meeder site to supply the production lines with electricity, steam and heat.

Technical data:

CHP plant (110 °C, 6 bar g)

  • Thermal output: 1,291 kW
  • Electrical output: 1,999 kW el.
     

Waste heat steam boiler

  • Steam output (saturated steam): 1,010 kg/h
  • Average steam pressure: 10 bar g