Paulaner Brewery Langwied

HeatCoolingPowerVentilationThermal TechnologyCongeloCalformaNewsEventMedia

Construction of an energy centre to supply the new brewery in Munich, Langwied. Installation of a multi-boiler plant for the heat supply of the production.

Own power generation via 2 CHP modules and use of the waste heat for the heating network.

Technical data:
  • High pressure hot water: 32 MW, 160°C, 16 bar
  • Hot water: 16 MW, 105°C, 10 bar
  • Central heating: 3 MW, 35 °C, 10 bar
  • Electrical power: 2 × 999 kW