Construction of an energy centre to supply the new brewery in Munich, Langwied. Installation of a multi-boiler plant for the heat supply of the production.
Own power generation via 2 CHP modules and use of the waste heat for the heating network.
Technical data:
- High pressure hot water: 32 MW, 160°C, 16 bar
- Hot water: 16 MW, 105°C, 10 bar
- Central heating: 3 MW, 35 °C, 10 bar
- Electrical power: 2 × 999 kW