Bürger Crailsheim

HeatCoolingPowerVentilationThermal TechnologyCongeloCalformaNewsEventMedia

Energy supply for a new production hall with compressed air, water, steam, condensate and implementation of a cogeneration plant with steam generation. The engine waste heat is used for domestic heating water and heating as well as heating of the building. A 80 m³-buffer was installed to compensate load fluctuations.

Image
Technical data:
  • Electrical capacity: 1,99 MW
  • Thermal capacity: 1,07 MW
  • Steam generation: 2 × 1,500 kg/h, 10 barü