Crailsheim Residents
Supply of utilities to a new production hall, including compressed air, drinking water, steam and condensate; installation of a combined heat and power (CHP) unit with a steam generator acting as an exhaust gas heat exchanger. The engine waste heat is used to heat drinking water and for building heating. An 80 m³ buffer tank was installed to manage load fluctuations.
Technical data:
- Electrical output: 1.99 MW
- Thermal output: 1.07 MW
- Steam generators: 2 × 1,500 kg/h, 10 bar