A central partial air conditioning unit was positioned on the roof of the BA3 production hall for air conditioning. The unit is equipped with a cross-flow heat recovery system. The draught-free supply air is introduced via textile hoses.
Technical data
- Air capacity: 60.000 m³/h
- WRG power: 556 kW
- Heater power: 344 kW
- Coolinc capacity: 524 kW