Kennametal, Mistelgau

HeatCoolingPowerVentilationThermal TechnologyCongeloCalformaNewsEventMedia

A central partial air conditioning unit was positioned on the roof of the BA3 production hall for air conditioning. The unit is equipped with a cross-flow heat recovery system. The draught-free supply air is introduced via textile hoses.

Image
Technical data
  • Air capacity: 60.000 m³/h
  • WRG power: 556 kW
  • Heater power: 344 kW
  • Coolinc capacity: 524 kW