Kennametal, Mistelgau
A central split air conditioning unit was installed on the roof of production hall BA3 to provide air conditioning for the hall.
The system is equipped with cross-flow heat recovery. The draught-free supply of fresh air is provided via fabric ducts.
Technical data:
- Air flow rate: Supply air: 60,000 m³/h, Exhaust air: 60,000 m³/h
- Heat recovery capacity: 556 kW
- Heater capacity: 344 kW
- Cooler capacity: 524 kW