Installation of a CHP, exhaust gas steam generator and heat exchanger, absorption chiller with NH3 -8°C, lube oil system, noise reducing enclosure, exhaust silencer and switchgear with superordinate control. Assembly on site, commissioning and trial operation.
1st construction stage
- Thermal capacity 2,48 MW
- Electrical capacity: 2,15 MW
- Steam output: 1,5 to/h / 12,0 bar
- cooling via ago congelo® NH3 / H2O-absorber 500 KW
2nd construction stage
- Thermal capacity: 2,28 MW
- Electrical capacity: 2,14 MW
- Steam capacity: 1,5 to/h
- cooling via ago congelo® NH3 / H2O-absorber 500 KW